Construction: Shopping centre ATRIUM Dubeň – conversion works of the hypermarket Carrefour, Žilina
Work commencement: 7th September, 2017
Activity: General contractor of the construction
Project manager: Ing. Juraj Šnirc
We took the construction site over and began with the construction conversion of the Carrefour hypermarket in the shopping centre ATRIUM Dubeň in Žilina on September 7th, 2017. It is a reconstruction that mostly includes demolition works and building of new tenant units.
A conversion of the floor and laying of floor tiles, assembly of partition walls and parting constructions of the interior area, installation of VZT, ZTI, ELI, EPS, EZS, CCTV, HSP assembly, supply of VZT and UK devices, supply and assembly of ZOTD smoke and heat control systems, MaR assembly, SHZ, assembly of fillings of the openings, a marquee with glazing and painting works will be a part of the works.