Buyer: Slovnaft a.s.
Construction: maintaining work and exchange of technology – CAR WASH
Activity: Realization
Project manager: Ing. Štefan Litomerický
Start of the construction: 01.03.2016
End of the construction: 10.04.2016
Locality: Slovnaft a.s., Banská Bystrica-Partizánska street, k.ú. Banská Bystrica
The purpose of the construction work and maintaining work was a total renovation and redesign – modernization of the interior in the car wash at the gas station. Modernization includes replacement of the cobbles, pavage, replacement of doors and gates, construction of a artificial vetilation at the car wash, exchange the whole wiring system with also a technology, exchange lamps for LED lamps, exchange a heating system and more of the maintaing work. Furthermore according to the project, modernization of the exterior of the manual carwash will be done. Modernization includes exchange the roof construction above the washing boxes, exchange the interior and exterior technologies (AQUARAMA), exchange grates above the wells, reconstruction of the handling areas and cleaning collecting canal.