Buyer: Slovnaft a.s.
Construction: Construction of a new slump, GS Slovnaft Námestovo
Activity: Contractor
Start of the construction work: 27.11.2014
End of the construction work: 04.12.2014
Locality: Námestovo
The construction site is is situated in an already existing area of GS Slovanft, Námestovo. Due the fact that the original COV wasnt able to ensure with its capacity and technology, was removed. Project was dealing with a tank construction, which is fitter instead of the original COV. The slumo is fitted behind the petrol station in a demolished area of COV.